Road earthwork quantity calculations is essential for any road construction project, by knowing the quantities of cutting and filling require contractor or authority can estimate how much quantity of earthwork we require to complete the road construction or how much quantity of earthwork is to be import from other place. 
There are three different methods popularly used for doing Earthwork Calculation for Cutting/Filling Projects. 

Earthworks are engineering works created through the moving and/or processing of massive quantities of soil or unformed rock. Earthwork is done to reconfigure the topography of a site to achieve the design levels. Earthwork involves cutting and filling to achieve the required topography.  
Cutting is the process of excavating earth material from a work location to achieve the desired topography. 

Filling is the process of moving the excavated material or additional earth material to a work location to achieve the desired topography.