General practice is to check when the beam and slab elements are ready for concreting i.e. reinforcement fully tied up but ideal practice would be to check it in two phase.
01. First check formwork before you allow placing of reinforcement. This is necessary as certain formwork defects can’t be corrected or are difficult to correct after reinforcement is placed in position. 
02. Checking reinforcement.
In this Video Lecture you are able to Learn checklist for beam slab and column before staring concrete.

Share on :

Author :

No comments:

Post a Comment

live stream

Live stream with us at 7 pm

730

Cairo

2230

KSA

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.
Email: engsaidragab@gmail.com
All Rights Reserved Engineering Society
Designed by