1-The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units.
2-The 330 m long Naga Hammadi Nile river barrage consists of a power station, weir facilities and two navigation locks.
3-Nile river barrage Naga Hammadi - arge area transportable units
The variable VARIO girder wall formwork, together with SKS climbing scaffold, formed large area transportable units. The intermediate piers of the weir facility were cost-effectively climbed using concreting cycle heights of up to 3.60 m.
4-Nile river barrage Naga Hammadi - concreting cycle heights of up to 3,60 m
With concreting cycle heights of up to 3,60 m, the intermediate columns of the weir facility could be economically climbed.
Sir I want an case study of this project. I am from India and we are doing project of slipformwork. I am in 6th semester in diploma civil engineering and I want the case study of this project so can u give me the information he photo related to this project ASAP. Plzz