Pile Load Test at Site

Pile Load Test at Site

Pile Load Test at Site
 Pile Load Test at Site 
 
 
Load tests on piles are conducted on completion of 28 days after casting of piles. Two types of tests namely initial and routine tests, for each type of loading viz. vertical, horizontal (lateral) pull out, are performed on piles.
Related Topics:

Post a Comment

أحدث أقدم