Bridge Cost Estimate Worksheet


The Preliminary Cost Estimate Worksheet should be used to estimate the bridge cost for new and replacement bridge projects. The worksheet is based on the bridge shoulder break methodology. 
This methodology was established for use early in a project when bridge particulars, such as abutment heights and locations, are not known. The costs and the factors used in the worksheet were established based on review of current bridge contract bidding practices.
Click here to download

Share on :

Author :

No comments:

Post a Comment

live stream

Live stream with us at 7 pm

730

Cairo

2230

KSA

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.
Email: engsaidragab@gmail.com
All Rights Reserved Engineering Society
Designed by