While planning the project for the foundation of a tank it is essential to study the geologic structure of the construction site and hydro-geologic conditions. The soil exploration depth, as regards those, located lower the foundation base, depends on pressure, carried over by the construction to the basement.
The depth is accepted to be either equal or more than the depth of the basement active area (compressible thickness of the basement soil). Soil investigation is carried out by pitting and punching.
Post a Comment