Top Eight reasons of formwork, Shuttering failures - Engineering Society
Press Enter To Search
404 This page was not found

Tuesday, December 25, 2018

Top Eight reasons of formwork, Shuttering failures

The formwork lay an important role in the construction. The formwork or shuttering use for the construction work must be strong to hold the dead and lie load of the structure. The formwork is also known as a temporary structure of the building.

Share on :

Author :

No comments:

Post a Comment

live stream

Live stream with us at 7 pm

730

Cairo

2230

KSA

Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book. It has survived not only five centuries, but also the leap into electronic typesetting, remaining essentially unchanged. It was popularised in the 1960s with the release of Letraset sheets containing Lorem Ipsum passages, and more recently with desktop publishing software like Aldus PageMaker including versions of Lorem Ipsum.
Email: engsaidragab@gmail.com
All Rights Reserved Engineering Society
Designed by